<?xml version="1.0" encoding="utf-8" standalone="yes"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>Traffic on Arlington Report</title><link>https://arlingtonreport.com/tags/traffic/</link><description>Recent content in Traffic on Arlington Report</description><generator>Hugo</generator><language>en-us</language><lastBuildDate>Tue, 03 Nov 2026 17:55:00 +0000</lastBuildDate><atom:link href="https://arlingtonreport.com/tags/traffic/index.xml" rel="self" type="application/rss+xml"/><item><title>Arlington Road Report: Walker Street Closes Wednesday, Summers Road Still Off-Limits</title><link>https://arlingtonreport.com/posts/arlington-road-report-walker-street-summers-road/</link><pubDate>Tue, 03 Nov 2026 17:55:00 +0000</pubDate><guid>https://arlingtonreport.com/posts/arlington-road-report-walker-street-summers-road/</guid><description>&lt;p>Two road notes from the Town of Arlington before you head out this week. One closure is brand new, and one is a closure some drivers apparently wish were over already.&lt;/p>
&lt;h2 id="walker-street-closed-wednesday-nov-4">Walker Street: closed Wednesday, Nov. 4&lt;/h2>
&lt;p>A section of Walker Street will be closed to through traffic on &lt;strong>Wednesday, Nov. 4&lt;/strong>, while crews repair a sewer line, the Town announced Tuesday.&lt;/p>
&lt;ul>
&lt;li>&lt;strong>Where:&lt;/strong> One block of Walker Street, between Greenlee Street and Jackson Street, according to the Town&amp;rsquo;s closure map.&lt;/li>
&lt;li>&lt;strong>Detour:&lt;/strong> Use Brown Street, which you can reach from either Greenlee Street or Jackson Street. Detour signs will be posted.&lt;/li>
&lt;li>&lt;strong>How long:&lt;/strong> The Town expects the work to wrap up by the end of the day Wednesday.&lt;/li>
&lt;/ul>
&lt;h2 id="summers-road-still-closed-yes-really">Summers Road: still closed (yes, really)&lt;/h2>
&lt;p>That shiny new asphalt on Summers Road isn&amp;rsquo;t open yet. The Town said Tuesday that Summers Road is still closed and remains an active construction zone, with contractors still on site.&lt;/p></description></item></channel></rss>